The following summary of planned new and ongoing road improvements over the coming week is correct as of 27 January but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.
M3 junctions 2 (M25) to 4a Farnborough, Hampshire: Smart motorway improvement
Work to reduce congestion and improve journey times continues this week with narrow lanes a 50mph speed limit in place on both carriageways between junctions 2 and 4a, with a free recovery service operating 24 hours a day.
The southbound carriageway between junctions 2 and 4 including the M25 clockwise slip road and anti-clockwise link road to the M3 southbound, junctions 3 entry slip and junctions 3 and 4 exit slips will be closed overnight between 8pm and 5.30am, on Monday 30 January for four nights and between 8pm and 7am on Friday 3 February and Saturday 4 February.
A clearly signed diversion will be in place via:
- M3 southbound junction 2 to M25 junction 13 via A30 to A331 to M3 junction 4
- M25 clockwise junction 13 via A30 to A331 to M3 junction 4
- M25 anti clockwise junction 13 via A30 to A331 to M3 junction 4
The northbound carriageway between junction 4 and 2 including junction 4 and 3 entry slips, junction 3 exit slip and junction 2 northbound clockwise link road and anti-clockwise slip road will be closed overnight between 8pm and 5.30am, on Monday 30 January for four nights and between 8pm and 7am on Friday 3 February and Saturday 4 February. A clearly signed diversion will be in place via: M3 junction 4 to A331 to A30 to M25 junction 13 to M3 junction 2 northbound.
For further details, visit the scheme website.
M3 junctions 6 to 7 Basingstoke, Hampshire: resurfacing
Work to improve journeys by resurfacing a section of the southbound carriageway takes place this week. The M3 southbound will be closed from junction 6 to junction 7 overnight, between 9pm and 6am, on Tuesday 31 January. A clearly signed diversion will be in place via Basingstoke.
M3 junction 8 Popham, Hampshire: bridge strengthening
Work to maintain journeys by undertaking bridge bearing and support replacement continues this week. Narrow lanes and a 50mph speed restriction are in place on the link form the M3 southbound to the A303 westbound 24 hours a day until May.
M3 junction 11 Winchester, Hampshire: safety barrier
Work to improve safety by carrying out repairs to the barrier along the southbound slip road continues this week. Lane closures will be in place on the southbound carriageway overnight, between 10pm and 6am, until Friday 24 February (Monday to Friday only).
M4 junction 6 Windsor, Berkshire: drainage
Work to ensure road user safety by maintaining the drainage asset at the junction takes continues this week. Lane closures will be in place on the east and westbound approaches to the junction overnight, between 9pm and 6am, until Monday 6 February (Monday to Friday only).
In addition, the westbound exit and entry slip roads at the junction will be closed overnight, between 9pm and 6am, from Thursday 2 February for 3 nights (Monday to Friday only). Clearly signed diversions will be in place via the adjacent junctions.
M4 junction 10 Wokingham, Berkshire: bridge reconstruction
Work to refurbish the bridge which carries the link roads over the M4 continues this week. Narrow lanes and a 40mph speed limit are in place on the slip roads and a 50mph speed limit is in place on the M4 carriageway until November 2017.
The slip road from the M4 eastbound carriageway to the A329(M) Wokingham bound carriageway will be closed overnight, between 9pm and 5am, on Monday 31 and Tuesday 31 January. A clearly signed diversion will be in place via junction 8/9 and return.
M4 junction 11 Reading, Berkshire: surveys
Work to improve journeys by carrying out surveys in preparation for converting the M4 into a Smart Motorway continues this week. Lane closures will be in place on the eastbound exit slip road at the junction overnight, between 9pm and 6am, from Monday 30 January for 5 nights.
M4 junctions 11 to 12 Reading, Berkshire: resurfacing, surveys and bridge joint
Work to improve journeys by replacing a bridge joint and resurfacing a section of the M4 westbound carriageway between Moto services and junction 12 starts this week. The westbound carriageway will be fully closed overnight, between 10pm and 6am, from Wednesday 1 February for 9 nights (Monday to Friday only). A clearly signed diversion will be in place via the A33 and A4.
Work to improve journeys by carrying out surveys in preparation for converting the M4 into a Smart Motorway continues this week. The eastbound exit and entry slip roads for Moto Reading Service Area will be closed overnight, between 10pm and 6am, on Thursday 2 February.
M4 junctions 13 Chieveley to 12 Reading, Berkshire: resurfacing
Work to improve journeys by resurfacing a section of the M4 eastbound carriageway starts this week. The eastbound carriageway will be closed overnight, between 10pm and 6am, from Tuesday 31 January for 5 nights (Monday to Friday only). A clearly signed diversion will be in place via the A4.
M4 junction 15 Swindon, Wiltshire: surveys
Work to improve journeys by carrying out surveys around junction 15 takes place this week. Lane closures will be in place on all approaches to the junction overnight, between 9pm and 6am, on Friday 3 February.
M27 junction 1 Cadnam, Hampshire: drainage
Work to ensure road user safety by maintaining the drainage asset at the junction takes place this week. Lane closures will be in place on the east and westbound approaches to the junction overnight, between 9pm and 6am, from Monday 30 January for 5 nights.
M27 junctions 7 Hedge End, Hampshire: surveys
Work to improve journeys by carrying out carriageway surveys at junction 7 takes place this week. Lane closures will be in place on the westbound approach to the junction and on the roundabout overnight, between 9pm and 6am, on Thursday 2 February.
M27 junctions 7 Hedge End to 8 Bursledon, Hampshire: resurfacing
Work to improve journeys by resurfacing a section of the M27 eastbound carriageway finishes this week. The M27 eastbound carriageway will be closed from junction 7 to junction 8 overnight, between 10pm and 6am, until Tuesday 31 January. A clearly signed diversion will be in place via Charles Watts Way, Kanes Hill (A27) and A3024.
M27 junctions 9 Whiteley to 8 Bursledon, Hampshire: resurfacing
Work to improve journeys by resurfacing the M27 between Bursledon and Whiteley continues this week. The M27 westbound carriageway will be closed from junction 9 to junction 8 overnight, between 10pm and 6am, until Wednesday 22 February (Monday to Friday only). A clearly signed diversion will be in place via the A3051 Botley Road, Curdridge, A334 through Botley and Hedge End, re-joining the M27 at junction 7.
M27 junctions 11 to 12 Portsmouth, Hampshire: resurfacing
Work to improve journeys by resurfacing a section of the M27 eastbound carriageway near Port Solent continues week. The M27 eastbound carriageway from junction 11 to the A27 Eastern Road junction, and the M275 northbound link to the A27 eastbound carriageway will be closed overnight, between 10pm and 6am, until Friday 16 February (Monday to Friday only). Clearly signed diversions will be in place via the A27 for M27 traffic and the A3 Northern Parade for M275 traffic.
A3(M) junction 2 Horndean to Charlton, Hampshire: resurfacing
Work to improve journeys by resurfacing a section of the northbound carriageway takes place this week. The A3(M) northbound carriageway will be closed from junction 2 to Charlton overnight, between 9pm and 6am, on Friday 3 February. A clearly signed diversion will be in place via the old A3.
A3 Shackleford, Surrey: drainage surveys
Work to improve journeys by carrying out drainage surveys at the junction takes place this week. The northbound entry slip road will be closed overnight, between 9pm and 6am, from Monday 31 January for 2 nights. The southbound entry slip road will be closed overnight, between 9pm and 6am, from Wednesday 1 February for 3 nights. Clearly signed diversions will be in place via adjacent junctions.
A3 Hindhead Tunnel, Surrey: maintenance
Work to maintain journeys by carrying out tunnel maintenance takes place this week. The northbound tunnel will be closed overnight, between 9pm and 6am, from Monday 30 January for 4 nights. Traffic will be diverted through the southbound tunnel in contraflow under a 40mph speed limit.
A27 Hilsea to Bedhampton, Hampshire: safety barrier
Work to improve safety by carrying out repairs to the barrier along the A27 central reserve continues this week. Lane closures will be in place on the east and westbound carriageways overnight, between 9pm and 6am, until Friday 10 February (Monday to Friday only).
A34 Three Maids Hill (Winchester), Hampshire: surveys
Work to improve journeys by carrying out surveys of the A34 southbound carriageway takes place this week. The southbound exit and entry slip roads at the A272 Three Maids Hill junction will be closed overnight, between 9pm and 6am, on Monday 30 January. Clearly signed diversions will be in place via adjacent junctions.
A34 Bullington Cross to Sutton Scotney, Hampshire: resurfacing
Work to improve road user’s journeys by resurfacing a section of the A34 southbound carriageway continues this week. The A34 southbound carriageway will be closed from the A303 (Bullington Cross) to the A272 (Three Maids Hill) overnight, between 10pm and 6am, from Friday 3 February for 5 nights (Monday to Friday only). A clearly signed diversion will be in place via the A303 eastbound carriageway, then south on the A33 Basingstoke Road.
A34 Speen, West Berkshire: resurfacing
Work to improve journeys by resurfacing a section of the northbound carriageway takes place this week. A lane closure will be in place overnight, between 9pm and 6am, on Monday 30 January.
A34 Didcot to Abingdon, Oxfordshire: surveys
Work to improve journeys by carrying out surveys of the A34 southbound carriageway takes place this week. Lane closures will be in place on both carriageways between the Marcham Interchange and Chilton junction overnight, between 9pm and 6am, on Tuesday 31 January and Wednesday 1 February.
A34 Oxford, Oxfordshire: resurfacing
Work to improve road user’s journeys by resurfacing the A34 northbound carriageway around Oxford continues this week. The A34 northbound carriageway will be closed from the Hinksey Hill Interchange to the Botley Interchange overnight, between 10pm and 6am, until Friday 10 February (Monday to Friday only). A clearly signed diversion will be in place via the Oxford ring-road (A4142 Eastern-by-Pass, A40 Northern-by-Pass and A44).
A34 Weston-on-the-Green, Oxfordshire: resurfacing
Work to improve road user’s journeys by resurfacing a damaged section of the A34 southbound carriageway takes place this week. The A34 southbound carriageway will be closed from the M40 junction 9 roundabout to Islip overnight, between 10pm and 6am, on Monday 30 January.
Clearly signed diversions will be in place via M40 junction 8a and the A40 (for motorway permitted vehicles) and via the A4095 and A44 between Bicester and Peartree (for non-motorway vehicles).
A303 Bullington, Hampshire: resurfacing
Work to improve journeys by resurfacing a section of the westbound carriageway takes place this week. The A303 westbound carriageway will be closed between the slip roads overnight, between 9pm and 6am, on Thursday 2 February. A clearly signed diversion will be in place.
A404(M) junction 9a Maidenhead, Berkshire: vegetation
Work to improve journeys by cutting back overgrown vegetation takes place this week. The southbound entry slip road at the junction will be closed overnight, between 9pm and 6am, on Friday 3 February. A clearly signed diversion will be in place via junction 9b.
General enquiries
Members of the public should contact the Highways England customer contact centre on 0300 123 5000.
Media enquiries
Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.
read more