Budget representations

I have made representations for more money for social care and for local schools in West Berkshire and Wokingham. I have also urged action to reduce excessive business rate rises, where the government has now indicated its intention to take some helpful measures tomorrow.  I look forward to the budget to see what results.




Water supply and floods

Yesterday I met Thames Water and reaffirmed the need  for  more action to be  taken to ensure adequate water supplies for the south-east by adding to reservoir capacity. I also urged more retention of water in reservoirs or areas where it can be stored during periods of heavy rainfall and swollen rivers to reduce the flood risk.




Notice: SO45 1TX, Esso Petroleum Company Limited: environmental permit issued

The Environment Agency publish permits that they issue under the Industrial Emissions Directive (IED).

This decision includes the permit and decision document for:

  • Operator name: Esso Petroleum Company Limited
  • Installation name: Esso Refinery
  • Permit number: EPR/BR6996IC/V005



Notice: BB7 4QF, Castle Cement Limited: environmental permit draft decision advertisement

The Environment Agency consults the public on certain applications for waste operations, mining waste operations, installations, water discharge and groundwater activities. In some cases they also consult on draft decisions for environmental permits. The arrangements are explained in its Public Participation Statement
These notices explain:

  • the Environment Agency’s proposed decision and the reasons and considerations on which they’ve based this
  • additional relevant information available since the application was advertised
  • any information or guidance provided by the Secretary of State relevant to the application



Press release: Wilton flood defence scheme to be shown at public drop-in event

The Environment Agency is holding a public consultation in Wilton, near Salisbury, to explain how it plans to reduce flood risk to local homes and businesses.

The Environment Agency is keen for local people to share their views on its proposals and any experiences they have of flooding.

The consultation will take place on 10 March 2017 from 3pm to 7pm, at:

The Cricket Pavilion
Recreational Ground
Wilton

Mark Goldingay of the Environment Agency said:

This event is an ideal opportunity for people to learn about the Environment Agency’s latest plans for Wilton. Environment Agency officers will be on hand to explain the proposals and the steps people can take to prepare themselves against flooding. We’d like to hear the views of local residents and look forward to sharing ideas on how best to reduce flood risk in Wilton.

Wilton’s existing flood defences protect some areas in the centre of the town. There are 30 properties currently at risk of flooding from the nearby River Wylye. In large flood events, flood water can bypass the defences and flow across the recreational ground towards the Castle Lane area. Properties in Crow Lane are also at risk.

The proposed solution is to build a raised flood embankment around the edge of the recreational ground, joining the existing flood defences beside Wiley Terrace. The height of the flood bank will be approximately 0.5m above existing levels with shallow side slopes. An access ramp would be provided over the embankment. A flood wall is also being proposed to protect properties in Crow Lane.

The proposed scheme would help protect the 30 properties in the centre of Wilton currently at high risk of flooding.

The Environment Agency aims to secure funding and obtain planning permission for a suitable scheme by the autumn of 2017. It will then draw up a detailed design and carry out further public consultation before starting construction in early 2018. If all goes well, the new scheme should be completed by the summer of 2018.