Tag Archives: Fraser Macpherson

image_pdfimage_print

Weekly Road Report – West End Ward #dundeewestend

DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR WEST END WARD – WEEK COMMENCING MONDAY 23 OCTOBER 2017

A85 Riverside Drive – prohibition of right turn from westbound lane of Riverside Drive into Riverside approach and prohibition of right turn from Riverside Approach in to Riverside Drive for 7 weeks for works to the sea wall.  Prohibitions will only be in place when required.

Polepark Road (Fyffe Street to Milnbank Road) – closed from Monday 23 October for 5 working days for Scottish Water sewer repair works.
read more

Scottish Water works Blackness Road – bus stops #dundeewestend

A number of constituents have commented to me aboutnthe lack of temporary bus stops on Blackness Road during the Scottish Water temporary works.

I contacted the City Council’s transportation team about this and have been advused as follows :

“The extent of the works is temporary traffic lights contained within the area between Forest Park Road and Rosefield Street. 

As a result two bus stops are affected, namely Blackness Road opp Forest Park Road and Blackness Road opp Annfield Street.

The contractor has displayed signs informing passengers that both bus stops are out of use.

A temporary stop cannot be erected in place of either bus stop due to safety. Installing stops to the east would mean buses stopping outside the Fire Station, or close to a bend, which are also close to an excavation and in an area which has limited footway close to the carriageway. 

Furthermore temporary stops cannot be installed to the west, as this area is still confined within the works, and installing stops outside the works area would mean they were too close to existing bus stops.

Passengers should instead use existing bus stops, Blackness Road opp Peddie Street and near Abbotsford Street which are both approximately 250-300m west of the bus stops which are out of use.”

Scottish Water’s Corporate Affairs Officer advised me earlier this week that :

“The original timescale was 2 weeks from 9th October.  I would fully expect all works to be completed by end of play Sunday 22nd October.”
read more