Police will implement special traffic arrangements on January 4 (Saturday) and January 5 (Sunday) to facilitate the holding of Hong Kong-Zhuhai-Macao Bridge (HZMB) (Hong Kong Section) Half Marathon 2024/25.
The following traffic arrangements will be implemented on the section of HZMB Hong Kong Link Road (HKLR) between the HZMB Hong Kong Port (HKP) and the Hong Kong Special Administrative Region Boundary, until the roads are safe for re-opening:
Phase I (From 4pm to about 11pm on January 4)
The left and middle lanes of the above section of HZMB HKLR (Hong Kong bound) will be closed, vehicles heading for Hong Kong must use the right lane of the above road section.
Phase II (From about 11pm on January 4 to about 2pm on January 5)
All traffic lanes of the above section of HZMB HKLR (Zhuhai and Macao bound), the middle lane of the above section of HZMB HKLR (Hong Kong bound), and the slip roads leading to/from San Shek Wan Turnaround Facility will be closed.
In connection with the road closure as mentioned above, the above section of HZMB HKLR (original Hong Kong bound) will be converted into two-way traffic, vehicles heading for Zhuhai and Macao will be diverted to use the original Hong Kong bound road section.
Phase III (From about 2pm to about 4.30pm on January 5)
The left and middle lanes of the above section of HZMB HKLR (Hong Kong bound) will be closed, vehicles heading for Hong Kong must use the right lane of the above road section.
Outbound goods vehicles lanes at the HZMB HKP after the Goods Vehicles Clearance Plaza will be closed from 9pm on January 4 to 3pm on January 5.
Actual implementation of traffic arrangements will be made depending on traffic and crowd conditions in the areas. Members of the public are advised to exercise tolerance and patience and take heed of instructions of the Police on site.
Follow this news feed: East Asia