Press release: Planned roadworks in the East of England: weekly summary for Monday 27 March to Sunday 2 April 2017
The following summary of planned new and ongoing road improvements over the coming week is correct as of 24 March 2017 but could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.
M11 junction 6 (M25) to junction 9 (A11), Essex: barrier repairs and litter clearance
Work to maintain safety by carrying out barrier repairs and improve journeys by carrying out litter clearance continues this week. Lane closures will be in place in both directions overnight, between 8pm and 5am, from Monday 27 March for five nights.
M11 junction 8 (Bishop’s Stortford) to junction 9 (Great Chesterford): congestion improvements
Work to improve congestion on the M11 by installing sign to restricts lorries from using lane 2 between 7am and 7pm on uphill sections of the carriageway in both directions between junctions 8 and 9 will start this week and is planned for completion by the end of March after which the restrictions will come into force. During the work, lane closures will be in place in both directions overnight, between 10pm and 6am from Monday 27 March to Friday 31 March.
A1 Brampton Hut to Sandy: routine maintenance
Work to improve safety by carrying out routine inspections of electrical equipment and structures begins this week. Lane closures will be in place overnight, between 8pm and 6am, until summer 2017.
A1 Sandy to Black Cat, Bedfordshire: drainage improvements
Work to improve journeys by renewing drainage on the A1 continues this week. Lane closures will be in place overnight, between 8pm and 5am, from Monday 27 March for five nights.
A5 to M1 link (Dunstable northern bypass), Bedfordshire: major improvement
Work to improve journeys by reducing congestion with the construction of a new dual carriageway running east from the A5 north of Dunstable and joining the M1 at a new junction 11a continues this week.
Lane closures will be in place on the M1 between junctions 10 and 13 overnight, between 10pm and 6am, from Monday 27 March for five consecutive nights.
Temporary traffic lights will be in place on the A5 and A505 overnight, between 8pm and 6am and during daytime between 09:30 and 15:30, from Monday 27 March for five consecutive days.
The scheme is due to be completed in June 2017. For further information, visit the scheme website.
A5 Friars Wash Flamstead: resurfacing
Works to place a high friction surface treatment to selected areas of the new road surface will take this week. We will be closing the A5 between Friars Wash and Chad Lane overnight, between 8pm and 6am. A clearly signed diversion for southbound traffic will be in place via B4540 Luton Road/ Markyate Road, A1081 Luton Road towards Harpenden, B487 Redbourn Lane, A5183 Dunstable Road to join the M1 at junction 9. For northbound traffic vehicles need to follow the diversion A5183 Dunstable road, B487 Rebdourn Lane, A1081 through Harpenden onto Front Street towards Slip End, B4540 Markyate Road/Luton Road back to join the A5 at Markyate.
A11 Babraham, Cambridgeshire: resurfacing
Work to improve journeys by carrying out resurfacing continues this week. The A11ceastbound will be closed between the M11 junction 9 (Stump Cross interchange) and the A1307 (Fourwentways interchange) overnight, between 8pm and 6am from Wednesday 22 March until Saturday 1 April. A clearly signed diversion will be in place via the M11 and A14.
A11 Red Lodge: carriageway retexturing
Work to improve the quality of the concrete carriageway on the A11 northbound between Red Lodge and Barton Mills continues this week. The northbound carriageway will be closed between Red Lodge and Barton Mills overnight between 8pm and 6am from Wednesday 22 March for 10 nights. A clearly signed diversion route in place via the A14 towards the Bury St Edmunds, before leaving at junction 40 and then take the B1103 towards Forrnham All Saints, then take the A1101 towards Lackford and Icklingham and then continue until re-join the A11 at the Barton Mills roundabout.
A12 Brentwood to Capel St Mary, Essex: routine maintenance
Work to improve safety by carrying out routine inspections of electrical equipment and structures continues this week. Lane closures will be in place overnight, between 8pm and 6am, until summer 2017.
A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
Early preparatory construction work on the A14 Cambridge to Huntingdon scheme has been underway for a number of months and main construction has now started. We are currently carrying out a variety of tasks for which we need to close lanes or carriageway on the A1, A14 and some local roads, usually overnight between 8pm and 6 am unless otherwise stated. The work includes:
- creating safe crossing points for plant on a number of local roads
- installing access points to our construction compounds
- taking core samples of the existing A1 and A14 carriageways to help us plan construction
- clearing sites next to the live carriageway of vegetation
- installing CCTV and average speed cameras
- installing information boards
For this week, the planned road closures are:
- Monday 27 March – A1307 inbound between A14 and Girton.
- Tuesday 28 March – A1307 inbound between A14 and Girton.
- Wednesday 29 March – A1307 inbound between A14 and Girton.
- Thursday 30 March – A1307 inbound between A14 and Girton.
- Friday 31 March – A1307 inbound between A14 and Girton.
For this week, the planned land closures are:
- Monday 27 March – A14 eastbound junction 31 lane two closed and two way off peak traffic lights – Ermine Street
- Tuesday 28 March – A14 eastbound junction 31 lane two closed
- Wednesday 29 March – A14 eastbound junction 31 lane two closed
- Thursday 30 March – A14 eastbound junction 31 lane two closed
- Friday 31 March – A14 eastbound junction 31 lane two closed and A1 southbound between Alconbury and Brampton Hut lane one eastbound
A14 Spaldwick: safety fence upgrade
Work to upgrade the verge side safety barrier at the side of the road in two locations around Spaldwick starts this week. There will be a temporary 50mph speed limit in place 24 hours a day and at weekends. The slip road at junction 18 (Spaldwick) will be closed from Monday 27 March for three nights overnight, between 8pm and 6am. Traffic will be diverted to travel to junction 18 and then to return eastbound to junction 18.
A47 Dogsthorpe, Cambridgeshire: junction improvements
Peterborough City Council is continuing its junction improvements at the A47/A15 Dogsthorpe junction, Peterborough. Lane closures will be in place 24/7 on the A47 with some overnight full closures.
For further information, visit the scheme website.
A47 Hockering to Easton, Norfolk: road surface repairs
Work to improve journeys by resurfacing the A47 between Hockering and Easton continues this week. The A47 will be closed between Hockering and Easton overnight, between 8pm and 6am, (Monday to Friday) until Friday 31 March. A clearly signed diversion for eastbound traffic will be in place A1065 to Fakenham, A148, A1067 towards Norwich, A140 Norwich Ring-road, A1075 Dereham Road westbound to re-join the A47 at Longwater. For westbound traffic vehicles need to follow the diversion A11 south- west to A134 roundabout at Thetford, A134 , A1065 northbound to Swaffham to re-join the A47.
A47 Shoreboat to Pullover, Norfolk: safety improvements
Work to improve safety on the A47 will start this week. Temporary traffic lights will be in place overnight, between 8pm and 6am, until Thursday 30 March.
A120 Panners interchange: resurfacing
Works to replace lining and anti-skid surface on the A120 westbound entry slip road. The slip road will be closed overnight, between 8pm and 6am on Thursday 30 March for two nights. Traffic will be diverted eastbound along the A120 to Galleys Corner Roundabout and return westbound to Panners Interchange.
A120 Marks Tey to Marks Farm, Essex: Resurfacing and lighting
Work to improve journeys on the A120 by resurfacing the carriageway continues this week. Full carriageway closures EB and WB (West Street to B1024 junction Coggeshall) Monday 27 to Fri 31. Temporary traffic lights will be in place on the A120 between Marks Farm and Marks Tey Monday 27 to Friday 31 overnight, between 8pm and 6am. Work is expected to be complete in May.
A120 Blackwater Bridge, Bradwell, Essex: Bridge re-waterproofing
Work to re-waterproof and resurface the Blackwater bridge near Bradwell should be complete this weekend. If this is postponed due to the weather the works will continue this week.
If the works are postponed until the end of the month the A120 will be fully closed between Hollies Road junction and Blackwater Aggregates, between 8pm on Friday 31 March to Monday 3 April. Access will only be permitted to residents and businesses from Marks Farm (eastbound) and Marks Tey (westbound). All other vehicles must use diversion route. No traffic will be able to pass over the bridge The footpath will remain open on one side.
Clearly signed diversions will be in place via the A12, A130 and A131 and reverse.
A120 Marks Tey junction 25 Slip Resurfacing
The A120 junction 25 slip from the A12 will be closed for resurfacing Saturday 1 and Sunday 2 April overnight (8pm – 6am). The diversion will be to junction 24 of the A12.
A12 Chitts Hill Colchester, Essex: foot bridge maintenance
Work to re-waterproof and resurface the Chitts Hill Footbridge continues this week. The bridge remains closed with a local pedestrian diversion route in place via Chitts Hill and Halstead Road. Work is due to be completed in April.
A120 Colchester to Hare Green, Essex: barrier maintenance
Work to renew the central reservation barrier continues on the A120 between the A12 junction 29 and Hare Green. Overnight (8pm – 6am) full westbound closures between J29 and Hare Green will take place on Saturday 1 and Sunday 2 April. From Monday 27 March to Sunday 2 April, there will be narrow lanes on the A120 westbound 24/7. All vehicles must follow the diversion, A131, A1232 to junction 29 of the A12.
From Monday 27 to Friday 31 March there will be eastbound lane closures and a 50mph speed limit in place. Work is expected to be complete in early April.
A120 Wix, Essex: drainage maintenance
Work to repair the drainage along the A120 near Wix continues this week. Temporary traffic lights will be in place overnight, between 8pm and 5am, from Monday 20 March for five nights. Work is expected to be complete in May.
A120 Porters Park bridge: bridge repairs
Work to re-waterproof and resurface the Porters Park (Waltham Road) bridge continues. There will a 24/7 full closure Monday 27 March to Sunday 2 April. The footway access will be maintained throughout. Vehicles need to follow the diversion B1137, A130, Essex Regiment Way, Wheelers Hill, Leighs Road, Drakes Lane, Boreham Road back on to Waltham Road, or reverse.
A120 Ewell Bridge: bridge repairs
The bridge is closed for on-going repairs. The pedestrian diversion is via Highfields Lane, Maldon Road, Ewell Hall Chase and reverse.
A120 Parkeston roundabout: technology installation
Work to improve traffic signals on the A120 at Parkeston roundabout will take place this week. Temporary traffic lights will be in place overnight, between 8pm and 6am from Wednesday 22 March for two nights.
A428 Eltisley, Cambridgeshire: street lighting and road markings
Work to replace the studs in the centre of the road will be done this week. The A428 will be closed through Eltisley between both junctions with the B1040 overnight, between 8pm and 6am, from Monday 27 March for two nights. A clearly signed diversion for westbound traffic will be in place for divers to take the A1198 at Caxton Gibbet, then, at Godmanchester follow the A14 westbound to junction 21, at Brampton Hut take the A1 southbound and then follow the A1 to Wyboston roundabout. Drivers heading eastbound will follow this diversion in reverse.
General enquiries
Members of the public should contact the Highways England customer contact centre on 0300 123 5000.
Media enquiries
Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.