Policy paper: River Thames Scheme: environmental surveys
The surveys required in 2017 include continued groundwater monitoring at a number of agreed locations together with a range of ecological, habitat and archaeological surveys.
The surveys required in 2017 include continued groundwater monitoring at a number of agreed locations together with a range of ecological, habitat and archaeological surveys.