Independent report: Operational Safety (OSART) mission to Sizewell B nuclear power station: follow-up report
This is the UK government response to the report written by the IAEA, and the full IAEA Operational Safety Review Team (OSART) report which includes operational safety recommendations and highlights good practices found at Sizewell B to be considered by the relevant UK authorities, EDF Energy and Sizewell B.
This was a follow-up to a mission in October 2015.