Statistical data set: Gas and electricity prices in the non-domestic sector
Updated: Table 341 updated.
For enquiries concerning these tables contact:
Anwar Annut
Tel: 0300 068 5060
Email: Anwar.Annut@beis.gov.uk
Updated: Table 341 updated.
For enquiries concerning these tables contact:
Anwar Annut
Tel: 0300 068 5060
Email: Anwar.Annut@beis.gov.uk
Updated: QEP updates.
For enquiries concerning these tables contact:
Novica Petrovic
Tel: 0300 068 5057
Email: Novica.Petrovic@beis.gov.uk
Updated: Updated contact details for Supervising Engineer Panel
As a reservoir owner or operator you are required to appoint a panel engineer for large raised reservoirs, including those classed as ‘high-risk’:
Reservoirs that have been determined as ‘not high-risk’ only need to appoint a construction engineer during the design and construction, restoration or alteration of the reservoir. Supervising and inspecting engineers are not required.
Updated: Updated SR2012 No 10: on-farm anaerobic digestion facility using farm wastes only, including use of the resultant biogas
Standard rules are limited to premises used for agriculture and to wastes arising from on-farm activities, including dairies. They’re available to operators with an anaerobic digestion capacity of less than 100 tonnes of waste or a combination of waste and non-waste, both solid and liquid, on any one day.
You can apply online for most standard rules environmental permits.
Updated: Added to ‘details’ section: You can apply online for most standard rules environmental permits.
These rules allow you to operate a Part A installation involving the storage, physical treatment and composting of specified biodegradable wastes.
You can apply online for most standard rules environmental permits.