A spokesman for the Drainage Services Department (DSD) said today (March 24) that the DSD received a report on sewer leakage at Seaview Promenade, Deep Water Bay, in the evening yesterday (March 23). An investigation was immediately conducted and it was confirmed that the concerned sewer is a 450 millimetres diameter pressurised sewage main. The DSD is carrying out emergency repair works. The quality of the nearby waters will potentially be affected. Members of the public are advised not to swim at Deep Water Bay Beach and Repulse Bay Beach or the nearby waters to protect public health.
The DSD commenced the construction and rehabilitation of sewage rising mains in Southern District in January this year, to construct about 8.8 kilometres of sewage rising mains connecting the sewage pumping station at Island Road, Southern District, to the sewerage system at Ap Lei Chau Bridge Road, including the construction of about 1.5km subsea twin pressurised sewer to replace the above concerned pressurised sewage main, to enhance the overall stability of the sewage system.
Follow this news feed: East Asia