News story: Serious signalling irregularity at Cardiff East Junction

Over the Christmas period in 2016, Network Rail carried out extensive resignalling and track remodelling work in and around Cardiff Central station. This was the final stage of the Cardiff area signalling replacement scheme, a project which has been in progress for several years. This stage involved the closure of the power signal box at Cardiff, with control of the area moving to the South Wales Control Centre (SWCC), and changes to the track layout and signalling on the east side of Cardiff Central station.

Some of the new track layout was brought into use on 29 December. At 08:46 hrs on that morning the driver of train 2T08 from Cardiff Central to Treherbert, which had just left platform 7, noticed that a set of points in the route his train was about to take were not set in the correct position. Train 2T08 was the first up train on the Up Llandaff line after the start of service over the new layout.

The points at which the train stopped were redundant in the new layout and should have been secured in the normal position in readiness for their complete removal at a later date. The project works required eight point ends in two separate locations to be locked and secured in this way. In the event only six of the eight point ends were locked and secured, and the line was re-opened to traffic without the omission having been identified by the project team through the normal checking processes which should take place as part of this type of works. These two point ends were left in a condition in which they were unsecured and not detected by the signalling system, and the points at which train 2T08 stopped, points 817A, were left lying reverse. If the driver had not noticed the position of these points and stopped, the train would have been diverted towards line E (the former down relief line) on which trains can run in either direction. The new signalling system uses axle counters for train detection, and in this situation the system would not have identified that the train was in the wrong place.

A few minutes earlier, at 08:24 hrs, another train, down train 1V02, had travelled over the other points which had been left unsecured at the other end of the same crossover (817B). These points had been left in the normal position, which was correct for trains travelling over them in the down direction.

No-one was injured and no damage was caused by either event, and Network Rail acted quickly to secure both sets of points.

Our investigation will examine:

  • the events leading up to the commissioning of the new track layout in the area of 817 points
  • the methods that Network Rail’s Cardiff area signalling replacement project used for project management and assurance processes
  • the on-site team briefing and works management process.

It will also examine any relevant management issues and consider previous relevant recommendations made by the RAIB.

Our investigation is independent of any investigation by the railway industry or by the industry’s regulator, the Office of Rail and Road.

We will publish our findings, including any recommendations to improve safety, at the conclusion of our investigation. This report will be available on our website.

You can subscribe to automated emails notifying you when we publish our reports.

read more

Press release: Charity payment after water company permit breach

The Environment Agency has accepted an Enforcement Undertaking which will see Northumbrian Water pay £375,000 to charities in the North East after it breached environmental permitting regulations.

The offer also includes actions for Northumbrian Water to improve its operations and infrastructure.

It follows a sewage pollution incident involving West Wylam pumping station, investigated by the Environment Agency on 18 February 2015.

A blockage upstream of the pumping station resulted in raw sewage overflowing into Park Burn, a tributary of the River Tyne, breaching its permit.

Investigations showed significant water quality impact at Park Burn, with sewage odour and litter visible, and ammonia and suspended solid levels above accepted levels. Surveys indicated there had been no significant impact on the invertebrate population in the burn, and there was no impact on the Tyne, due to the river size and flow of the river.

Northumbrian Water carried out an immediate clean-up of the polluted area after it was reported to them.

Wide range of measures

The Environment Agency is making better use of the wide range of measures that are available to bring sites back into compliance as quickly as possible. Along with prosecutions, it uses enforcement notices, stop notices and civil sanctions to either improve performance or stop sites from operating.

The Environment Agency’s use of civil sanctions is in line with recent legislation extending their availability for more offences.

Civil sanctions such as these can be a proportionate and cost-effective way for businesses to make amends for less serious environmental offences. The company must offer to restore or remediate the harm caused by the incident, and demonstrate they will change their behaviour and ensure future compliance with legislation.

Proportionate response

Fiona Morris, Environment Manager with the Environment Agency in the North East, said:

We will always take forward prosecutions in the most serious cases and while we did initially consider prosecution, the company submitted an EU which we subsequently accepted.

We felt it to be a more proportionate response that would benefit the environment – achieving more than if the company had been convicted and fined.

We work hard to protect people and the environment, and a clear regulatory framework with agreed standards and targets has helped to drive major environmental improvements over the last few decades.

We’re continuing to improve our approach to ensure that we remain a fair and proportionate regulator.

The actions offered in the accepted EU, require Northumbrian Water to:

  • Make donations to Tyne Rivers Trust (£134,500), Northumberland Rivers Trust (£59,500), Wear Rivers Trust (£48,500), Tees Rivers Trust (£58,500).
  • Make a donation of £74,000 to Groundwork towards the Land of Oak and Iron Project.
  • Make improvements to site operations and infrastructure, including updated sewerage records, an updated process for asset planning and management and refurbishment of West Wylam pumping station, as well as an accelerated programme of planned upgrades to sewer infrastructure in the area.
  • Further inspections and surveys of the impacted area.
  • Pay Environment Agency costs.

Failure to comply with an EU may result in the offender being prosecuted for the original offence.

See the full list of the most recent enforcement undertakings

read more