£7.9 million has been awarded for the final phase of reconnecting the Keswick to Threlkeld multi-user trail which was severely damaged in Storm Desmond in 2015.
Follow this news feed: Public Health
Dec62018
£7.9 million has been awarded for the final phase of reconnecting the Keswick to Threlkeld multi-user trail which was severely damaged in Storm Desmond in 2015.
Follow this news feed: Public Health