The Environment Agency gives notice that it proposes to carry out improvement work to Millbrook tidal barrier in Millbrook (NGR SX 42857 52352). The proposed improvement work will involve the following:
- erosion control measures to toes of the barrier
- reinstatement of erosion at the end of the spillway and slipway
- replacement of control gates
This is in accordance with Regulation 5 of the Environmental Impact Assessment (Land Drainage Improvement Works) Regulations 1999 as amended by SI 2005/1399 and SI 2006/618.
Follow this news feed: DEFRA