Weekly Road Report – West End Ward #dundeewestend

image_pdfimage_print
DUNDEE CITY COUNCIL – WEEKLY ROAD REPORT

REPORT FOR WEST END WARD FOR WEEK COMMENCING MONDAY 17 JULY 2017

Riverside Esplanade/Riverside Drive (Tay Road Bridge off ramp to 75m along Riverside Drive) – westbound nearside lane closure for 20 weeks to facilitate V&A construction works.

SSE Glenagnes Cable Renewal – Lochee Road lane restrictions and closures on Blinshall Street, Fleuchar Street and Scott Street for 5 weeks.

A85 Riverside Drive – prohibition of right turn from westbound lane of Riverside Drive into Riverside approach and prohibition of right turn from Riverside Approach in to Riverside Drive for 21 weeks for works to the sea wall.  Prohibitions will only be in place when required.

Perth Road (at River Crescent) – temporary traffic lights for up to one week for sewer remedial works.

Ancrum Road (Charleston Drive to Logie Street) – closed for one week for carriageway resurfacing works.

Glamis Road (Blackness Road South for approx. 100m) – closed southbound from Monday 17 July for 5 days for installation of pedestrian refuge island.

A90 Perth Road (approach to Swallow Roundabout) – overnight (7.30pm – 6.30am) eastbound lane closures on Tuesday 18 July for carriageway patching works.

Forthcoming Roadworks

Perth Road (Hawkhill to Roseangle) – closed from Monday 24 July for 4 weeks for carriageway resurfacing.

Leave a Reply

Your email address will not be published.