Follow up on flooding

image_pdfimage_print

I am pursuing the issues of whether the following actions would help reduce local flood risk. This includes asking the authorities what progress they have made on the possible projects beneath. I would be interested in local comment on what is needed.

  1. Bund water containment on flood plain by the Emm
  2. Emm deepening and widening of water course in Wokingham and Winnersh
  3. Dredging of River Loddon at Loddon Bridge
  4. Containment of Loddon with higher banks at Loddon bridge roundabout
  5. Raising of road at Loddon bridge roundabout
  6. Increased water retention capacity in safe areas in Shinfield and Arborfield
  7. Further measures around Emmbrook School
  8. Measure to contain water which currently can reach homes in Earley
  9. Larger measures being considered for the course of the Loddon more generally

Leave a Reply

Your email address will not be published.